Project case study · 2019–2023

37 kWp factory photovoltaic installation

Document Anthony’s electrical work on a real 37 kWp photovoltaic installation.

My role

Installation work and electrical-panel design/work.

Technical context

  • Photovoltaic systems
  • Electrical distribution
  • Protection
  • Wiring
  • Panel work

Result / status

The 37 kWp system was installed.

Career stage